Can we stay open while the building is being dried?
Often in part. Drying is phased and contained so that unaffected areas stay usable, with separate access and the noisiest work moved outside trading hours. Whether the whole site has to close depends on where the water went, which services are affected and what the local building department requires.
The practical constraints are power, noise, air movement and safety. Drying equipment needs circuits and it is loud, and the containment that keeps dust and humidity out of a trading area has to be sealed properly to work.
Say early what has to keep running: a till area, a kitchen, a server room, a loading door. The plan can usually be built around two or three fixed requirements if they are known at the start.
What happens to wet stock and paper records?
They are triaged first. Items that can be saved are moved out of the wet area immediately; items that cannot are photographed, counted and listed before disposal. Paper is handled early because it degrades quickly and often cannot be replaced at all, unlike stock that has a supplier behind it.
Do not throw anything away before it is recorded, and do not stack wet boxes to deal with later. Both decisions are made in the first hours and both are hard to undo.
A written inventory produced while the work happens carries far more weight than a reconstruction afterwards. See insurance claim documentation for what that record should contain.
How long does commercial drying take?
Longer than a house of the same floor area, mainly because of concrete. A slab releases moisture slowly, and sealed or covered floors slow it further. Equipment typically runs continuously for a stretch of days, and the end is set by readings reaching dry standards rather than by a date.
Putting flooring back over a slab that is still wet is the commonest expensive mistake in commercial work. The adhesive fails, the covering lifts, and the job is done twice.
Ask for the daily log of slab and wall readings. It is both the evidence that drying is working and the record that supports the equipment days on the invoice.
Who is responsible, the landlord or the tenant?
The lease decides it, not the restoration crew. In most arrangements the building shell is the owner's responsibility and the fit-out, stock and contents are the tenant's, but leases vary and so do the insurance policies behind them. Our part is to document the facts clearly enough for both sides to use.
Where a boundary is crossed, each unit is read, photographed and recorded separately, even when the drying runs as one operation. That is what keeps the costs attributable later.
Work is authorized by whoever has authority for the premises, and that is confirmed in writing. In IL a written contract signed by both parties is required before work begins.
What makes a commercial flood job bigger or smaller?
Floor area and depth, whether the water was clean or came from a drain, how much stock and paper is at floor level, the floor construction, how much has to be kept trading, and after-hours access. The scope is priced and approved before work starts, and no figures are published here.
Two sites of the same size can be very different jobs. A tiled retail floor with nothing stored low is straightforward; a basement storeroom full of racked paper on a slab is not, and contaminated water widens everything that has to be removed.
Access does the rest. Loading height, lift availability, parking for equipment and the hours when the noisy work is allowed all shape the schedule. Waukegan Water Damage Restoration walks the site, writes the scope down with the readings behind it, and starts once it is agreed.